RB

RBC control plane

Product Delivery Observatory
GOVERNED EVIDENCE · 2026-09-14

DOT delivery & planning

Plan, execution, remaining scope, forecast, flow, reliability, and customer outcomes in one operating view.

Planned

17active governed specifications

Scope advanced

424% verified or in progress

Executed

424% verified

Released

4production specifications

In progress

0active work without verification credit

Superseded

0closed product decisions · excluded from active debt

AC delivery

38/11832% acceptance evidence

Known blockers

2reconciled management register

Products in view

1portfolio scope

Plan execution

Released · verified · in progress · remaining
DOT4 released · 0 verified · 0 in progress · 13 remaining
ReleasedVerifiedIn progressRemaining

Plan trajectory

Baseline → current execution → release
DOTSeventeen-spec governed machine plan
17Baseline plan17Current plan4Verified4Released

Current governed baseline; historical plan snapshots are not yet connected.

Plan, forecast, effort & risk

Governed evidence only
Product / baselineCurrent milestoneEstimated timelineForecastAI tokens / creditsLabor effortRisk
DOTSeventeen-spec governed machine planDOT-004 household, inquiry, and trip-profile foundationavailableUnavailableNo approved calendar start/end range exists.58–94 engineering working days remainingThe authoritative DOT plan reports 58–94 engineering working days remaining after DOT-004 completion; this is not a calendar commitment.UnavailableDevelopment-assistant token and credit telemetry is not connected.UnavailableActive work-hour telemetry is not connected. Owner cash rate declared $0/hour.2 known blockersDOT-004 is complete at 10/10; DOT-017 still requires real-phone browser proof, and source observability manifests lag the exact main revision.

Product evidence

Governed product and delivery signals
DOTimplementation · greenfield
Verification
32%
Evidence health
partial
Baseline
Pre-VF-SDD code baseline
  • Governed plan17 active specs
  • Superseded decisions0 closed
  • Verified specifications4/17
  • Released specifications4/17
  • Acceptance evidence38/118
  • Governed DOT scope17 specs
  • Source machine-plan scope17 specs
  • Specifications in progress or review1 specs
  • Specifications ready to start0 specs
  • DOT-004 verified ACs10/10 acceptance criteria
  • DOT-017 verified ACs8/9 acceptance criteria
  • Latest DOT app deploymentREADY
  • Live tenant verificationPASSED
  • Governed lifecycle emissionPR evidence only
  • Estimated remaining effort58–94 engineering working days
  • Structured dependency planAvailable
  • DORA metricsRecovery observed

Completion forecast

Typical–planning allowance · low confidence
Product-local forecastUnavailable
Lifecycle timing history is not connected for this product

Delivery flow

Completed governed specifications

Typical spec delivery

47h 42mmedian · 4 completed specs

Planning allowance

137h 42m85% of observed cycles finished within this time

Mean elapsed cycle

81h 2msensitive to long pauses and outliers

Work in progress

1excluded from completed-cycle statistics

Continuation rate

75%22 follow-up PRs on completed specs

Historical rework

0specs with changes requested

Open rework

0No open product-review rework

Accepted reviews

0recorded product-owner acceptance
ProductCompleted sampleTypicalPlanning allowanceMean elapsedIn progressEvidence window
DOT4 specs47h 42m137h 42m81h 2m12026-09-022026-09-10

Automatically collected VF-SDD lifecycle emissions. Cycle time begins at the first spec-labeled pull request and ends at the final merge only after product-local governed completion evidence passes. Product-review evidence remains separately governed.

Release reliability

DORA · product-scoped
ProductSuccessful production changesProduction attemptsLead time p50 / p85Monitoring coverageChange fail rateDowntimeRestore timeRework rate
DOT4 changesunique successful main SHAs16 attempts4 ready · 12 build errors49.8s / 50.4spartial2026-09-022026-09-13 · deployment evidence windowNot yet observableNeeds verified production-impact incident coverage; failed builds do not count.Not yet observableContinuous production availability monitoring is not verified.Not yet observableNeeds linked impairment-to-restoration events.33.3%

Zero is published only with verified monitoring. With verified coverage and no incidents, CFR and downtime are 0 while restore time is N/A. Current deployment evidence windows do not prove continuous availability. Build failures remain separate because they never reached users.

Specification evidence ledger 17 governed records
ProductSpecOutcomeStatusACsVerificationRelease
DOTDOT-001Product and architecture baselinecomplete8/8verifiedunavailable
DOTDOT-002Tenant resolution and wildcard domainscomplete6/6verifiedproduction
DOTDOT-003Agency identity, membership, and RLScomplete6/6verifiedproduction
DOTDOT-004Household, inquiry, and trip-profile foundationcomplete10/10verifiedproduction
DOTDOT-005Conversation session and traveler accessplanned0/6unverifiedunavailable
DOTDOT-006Structured conversational intakeplanned0/7unverifiedunavailable
DOTDOT-007Knowledge, event, and rule catalogplanned0/6unverifiedunavailable
DOTDOT-008Contextual seasonal suggestionsplanned0/6unverifiedunavailable
DOTDOT-009Advisor handoff briefplanned0/6unverifiedunavailable
DOTDOT-010Advisor Today dashboardplanned0/6unverifiedunavailable
DOTDOT-011CRM pipeline and trip workspaceplanned0/6unverifiedunavailable
DOTDOT-012Milestone engine and notificationsplanned0/6unverifiedunavailable
DOTDOT-013Traveler planning portalplanned0/6unverifiedunavailable
DOTDOT-014Disney travel-history archive ingestionplanned0/12unverifiedunavailable
DOTDOT-015Post-trip learning and rebookingplanned0/6unverifiedunavailable
DOTDOT-016Plans, onboarding, and commercial controlsplanned0/6unverifiedunavailable
DOTDOT-017Rebel Pixie brand foundationin_review8/9partialproduction