RB

RBC control plane

Product Delivery Observatory
GOVERNED EVIDENCE · 2026-09-14

RBC delivery & planning

Plan, execution, remaining scope, forecast, flow, reliability, and customer outcomes in one operating view.

Planned

33active governed specifications

Scope advanced

3091% verified or in progress

Executed

3091% verified

Released

30production specifications

In progress

0active work without verification credit

Superseded

1closed product decisions · excluded from active debt

AC delivery

293/29599% acceptance evidence

Known blockers

0reconciled management register

Products in view

1portfolio scope

Plan execution

Released · verified · in progress · remaining
Ross Beurmann Consulting30 released · 0 verified · 0 in progress · 3 remaining
ReleasedVerifiedIn progressRemaining

Plan trajectory

Baseline → current execution → release
Ross Beurmann ConsultingEarliest retained RBC plan
19Baseline plan33Current plan · +14 drift30Verified30Released
192022232425

Plan changed by +14 specifications from the earliest retained baseline.

Plan, forecast, effort & risk

Governed evidence only
Product / baselineCurrent milestoneEstimated timelineForecastAI tokens / creditsLabor effortRisk
RBCEarliest retained RBC planSPEC-037 cross-product lifecycle and reliability observabilityavailableUnavailableNo approved milestone date range exists in the retained public plan.3 specs · P50 1h 2m / P85 23h 47mModeled from 20 cyclesUnavailableDevelopment-assistant token and credit telemetry is not connected.57h 18m elapsed proxyPR-open-to-final-merge elapsed time; not active touch time. Owner cash rate declared $0/hour.0 known blockers0 declared blockers; structured risk-event history remains unavailable.

Product evidence

Governed product and delivery signals
Ross Beurmann Consultingproduction · greenfield
Verification
99%
Evidence health
partial
Baseline
Current governed plan
  • Governed plan33 active specs
  • Superseded decisions1 closed
  • Verified specifications30/33
  • Released specifications30/33
  • Acceptance evidence293/295

Completion forecast

Typical–planning allowance · low confidence

Verification remaining

1h 2m–23h 47m3 specs

Production remaining

1h 2m–23h 47m3 specs
Serialized model from 20 reconstructed cycles; not a calendar commitment.

Delivery flow

Completed governed specifications

Typical spec delivery

38.4mmedian · 31 completed specs

Planning allowance

14h 1m85% of observed cycles finished within this time

Mean elapsed cycle

8h 20msensitive to long pauses and outliers

Work in progress

9excluded from completed-cycle statistics

Continuation rate

45%35 follow-up PRs on completed specs

Historical rework

1specs with changes requested

Open rework

0No open product-review rework

Accepted reviews

1recorded product-owner acceptance
ProductCompleted sampleTypicalPlanning allowanceMean elapsedIn progressEvidence window
RBC31 specs38.4m14h 1m8h 20m92026-08-282026-09-13

Automatically collected VF-SDD lifecycle emissions. Cycle time begins at the first spec-labeled pull request and ends at the final merge only after product-local governed completion evidence passes. Product-review evidence remains separately governed.

Release reliability

DORA · product-scoped
ProductSuccessful production changesProduction attemptsLead time p50 / p85Monitoring coverageChange fail rateDowntimeRestore timeRework rate
RBC40+ changeslower bound; retained inventory truncated40 attempts40 ready · 0 build errors30.0s / 31.3sunverified2026-09-032026-09-13 · deployment evidence windowNot yet observableNeeds verified production-impact incident coverage; failed builds do not count.Not yet observableContinuous production availability monitoring is not verified.Not yet observableNeeds linked impairment-to-restoration events.0.0%

Zero is published only with verified monitoring. With verified coverage and no incidents, CFR and downtime are 0 while restore time is N/A. Current deployment evidence windows do not prove continuous availability. Build failures remain separate because they never reached users.

Specification evidence ledger 33 governed records
ProductSpecOutcomeStatusACsVerificationRelease
Ross Beurmann ConsultingSPEC-001Site Shell & Design Systemcomplete10/10verifiedproduction
Ross Beurmann ConsultingSPEC-002Homepagecomplete8/8verifiedproduction
Ross Beurmann ConsultingSPEC-003Servicescomplete8/8verifiedproduction
Ross Beurmann ConsultingSPEC-004Selected Work & Case Studiescomplete8/8verifiedproduction
Ross Beurmann ConsultingSPEC-005Grounded AI Sales Assistantcomplete7/7verifiedproduction
Ross Beurmann ConsultingSPEC-007About & Thinking Structurecomplete4/4verifiedproduction
Ross Beurmann ConsultingSPEC-008Content, SEO & Production Readinesscomplete7/7verifiedproduction
Ross Beurmann ConsultingSPEC-009Contact & Lead Capturecomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-010Assistant Hardeningcomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-011Approved Claims Content Integrationcomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-012Launch Security & Accessibility Remediationcomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-013CRM Inbox and Secure Accesscomplete12/12verifiedproduction
Ross Beurmann ConsultingSPEC-014Lead Status, Notes, and Follow-upcomplete13/13verifiedproduction
Ross Beurmann ConsultingSPEC-015Email Reply and Conversation Historycomplete12/12verifiedproduction
Ross Beurmann ConsultingSPEC-016Live SDD Delivery Dashboardcomplete14/14verifiedproduction
Ross Beurmann ConsultingSPEC-017Verification-First Spec-Driven Deliverycomplete10/10verifiedproduction
Ross Beurmann ConsultingSPEC-018VF-SDD Thought Leadership Articlecomplete10/10verifiedproduction
Ross Beurmann ConsultingSPEC-019Navigation Paritycomplete5/5verifiedproduction
Ross Beurmann ConsultingSPEC-020Admin Account & Supabase Auth Hardeningcomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-021Operational Delivery Telemetrycomplete12/12verifiedproduction
Ross Beurmann ConsultingSPEC-022Multi-Product Delivery Dashboardcomplete14/14verifiedproduction
Ross Beurmann ConsultingSPEC-023Dependency-Aware Verification Scopecomplete12/12verifiedproduction
Ross Beurmann ConsultingSPEC-024Product Dashboard and Plan Evolutioncomplete12/12verifiedproduction
Ross Beurmann ConsultingSPEC-025Per-App Product Dashboardscomplete10/10verifiedproduction
Ross Beurmann ConsultingSPEC-026Decision-Resolved Disposition and Product Healthcomplete8/8verifiedproduction
Ross Beurmann ConsultingSPEC-027Canonical Cal Product Brandingcomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-028Cal Governed Remediation Dashboard Statecomplete7/7verifiedproduction
Ross Beurmann ConsultingSPEC-029Continuous Cal Product Dashboard Synchronizationcomplete6/6verifiedproduction
Ross Beurmann ConsultingSPEC-034From Theater to Flow Portfolio Dashboard Integrationcomplete7/7verifiedproduction
Ross Beurmann ConsultingSPEC-035Spec Lifecycle, Product Evaluation, and Rework Telemetrycomplete17/18partialpreview
Ross Beurmann ConsultingSPEC-038Automatic VF-SDD Lifecycle Emission and Collectioncomplete10/10partialpreview
Ross Beurmann ConsultingSPEC-039Public VF-SDD Processcomplete6/7partialpreview
Ross Beurmann ConsultingSPEC-040Branded Product Description Pagescomplete8/8verifiedproduction