RB

RBC control plane

Product Delivery Observatory
GOVERNED EVIDENCE · 2026-09-14

FTTF delivery & planning

Plan, execution, remaining scope, forecast, flow, reliability, and customer outcomes in one operating view.

Planned

36active governed specifications

Scope advanced

13% verified or in progress

Executed

13% verified

Released

0production specifications

In progress

0active work without verification credit

Superseded

0closed product decisions · excluded from active debt

AC delivery

8/8100% acceptance evidence

Known blockers

01 product risk feed unknown

Products in view

1portfolio scope

Plan execution

Released · verified · in progress · remaining
From Theater to Flow Transformation Studio0 released · 1 verified · 0 in progress · 35 remaining
ReleasedVerifiedIn progressRemaining

Plan trajectory

Baseline → current execution → release
From Theater to Flow Transformation StudioThirty-six-spec outcome roadmap
36Baseline plan36Current plan1Verified0Released

Current governed baseline; historical plan snapshots are not yet connected.

Plan, forecast, effort & risk

Governed evidence only
Product / baselineCurrent milestoneEstimated timelineForecastAI tokens / creditsLabor effortRisk
FTTFThirty-six-spec outcome roadmapFTTF-002availableUnavailableThe roadmap has no approved public milestone dates.UnavailableOnly the foundation spec has observed delivery evidence; throughput is insufficient.UnavailableDevelopment-assistant token and credit telemetry is not connected.UnavailableActive work-hour telemetry is not connected. Owner cash rate declared $0/hour.UnavailableNo structured FTTF risk register or event history is published.

Product evidence

Governed product and delivery signals
From Theater to Flow Transformation Studiospecification · greenfield
Verification
100%
Evidence health
partial
Baseline
VF-SDD product foundation
  • Governed plan36 active specs
  • Superseded decisions0 closed
  • Verified specifications1/36
  • Released specifications0/36
  • Acceptance evidence8/8
  • Governed FTTF roadmap36 specs
  • Product outcomes7 outcomes
  • Planned features13 features
  • Transformation artifact registry42 artifacts
  • Current milestoneFTTF-002
  • Latest FTTF deploymentREADY

Completion forecast

Typical–planning allowance · low confidence
Product-local forecastUnavailable
Lifecycle timing history is not connected for this product

Delivery flow

Completed governed specifications

Typical spec delivery

2.6mmedian · 1 completed specs

Planning allowance

2.6m85% of observed cycles finished within this time

Mean elapsed cycle

2.6msensitive to long pauses and outliers

Work in progress

0excluded from completed-cycle statistics

Continuation rate

0%0 follow-up PRs on completed specs

Historical rework

0specs with changes requested

Open rework

0No open product-review rework

Accepted reviews

0recorded product-owner acceptance
ProductCompleted sampleTypicalPlanning allowanceMean elapsedIn progressEvidence window
FTTF1 specs2.6m2.6m2.6m02026-09-032026-09-03

Automatically collected VF-SDD lifecycle emissions. Cycle time begins at the first spec-labeled pull request and ends at the final merge only after product-local governed completion evidence passes. Product-review evidence remains separately governed.

Release reliability

DORA · product-scoped
ProductSuccessful production changesProduction attemptsLead time p50 / p85Monitoring coverageChange fail rateDowntimeRestore timeRework rate
FTTF10 changesunique successful main SHAs10 attempts10 ready · 0 build errors5.7s / 8.3sunverified2026-09-032026-09-13 · deployment evidence windowNot yet observableNeeds verified production-impact incident coverage; failed builds do not count.Not yet observableContinuous production availability monitoring is not verified.Not yet observableNeeds linked impairment-to-restoration events.0.0%

Zero is published only with verified monitoring. With verified coverage and no incidents, CFR and downtime are 0 while restore time is N/A. Current deployment evidence windows do not prove continuous availability. Build failures remain separate because they never reached users.

Specification evidence ledger 1 governed records
ProductSpecOutcomeStatusACsVerificationRelease
FTTFFTTF-001Repository and telemetry foundationverified8/8verifiedproduction